Latest News

New bridge saves time at Pleasington

PLEASINGTON members and visitors are no longer required to telephone the railway authorities to check the time the next train will pass through part of their course before they can safely use the level crossing.

In the past delays could be as long as 20 minutes, which literally stopped golfers in their tracks part way through their rounds. But those days are over now Network Rail has splashed out £1m on a new bridge, which will be officially opened this spring.

Meanwhile, the old gates have been padlocked and the fifth and 11th holes have been swapped over.